EL PASO, Texas (KTSM) – The Texas Department of Transportation (TxDOT) El Paso has released a list of road closures for June 28, which could affect your commute.

I-10 Widening West

56-hour closure

Friday, June 28 at 9 p.m., through Monday, July 1 at 5 a.m.

  • I-10 East and West will be closed at Thorn Avenue.

  • EASTBOUND DETOUR: Take Exit 9 (Redd Road), continue on South Desert Boulevard, re-enter I-10 past Mesa Street.

  • WESTBOUND DETOUR: Take Exit 11 (SH 20/Mesa Street/Thorn Avenue), continue on North Desert Boulevard, re-enter I-10 past Transmountain Road.

Crews will be demolishing the Thorn Avenue overpass.

Beginning Friday, June 28, at 9 p.m. and continuing through Spring 2025

  • Thorn Avenue will be closed between North Desert Boulevard and South Desert Boulevard.

Crews will be constructing a new Thorn Avenue overpass.

Monday, July 1 from 9 p.m. to 5 a.m.

  • South Desert Boulevard will be closed at Redd Road

DETOUR: Turn right on Redd Road, left on Doniphan Drive, left on Mesa Street and continue onto South Desert Boulevard.

Crews will be installing barriers.

Tuesday, July 2 from 9 p.m. to 5 a.m.

  • North Desert Boulevard will be closed at Thorn Avenue.

DETOUR: Turn left on Mesa Street, right on Doniphan Drive, right on Redd Road, and continue onto North Desert Boulevard. Access to neighborhood for local traffic only.

Crews will be installing barriers.

Daily Lane Closure

Monday, July 1, through Wednesday, July 3 from 9 a.m. to 4 p.m.

  • I-10 East and West will be reduced to one lane between Vinton Road and Transmountain Road.

Crews will be constructing retaining walls.

Guardrail Repair

From 9 a.m. to 4 p.m.:

Monday, July 1 from

  • I-10 West connector to Loop 375/Juarez (Ramp F) closed.

  • I-10 West connector to US-54 North (Ramp A) left lane closed.

Tuesday, July 2

  • US-54 CD lanes southbound entrance ramp to US-54 South between Altura and Trowbridge ramp closed.

Wednesday, July 3

  • Loop 375 (Border Highway) westbound between Yarbrough and Midway right lane closed

Friday, July 5

  • Loop 375 (Transmountain) eastbound between Main Gap and Border Patrol Museum left lane closed.

Monday, July 8

North Mesa Street Rehabilitation Project

Monday, July 1 through Tuesday, July 2 from 9a.m. to4p.m. (Daily)

  • Mesa (SH-20) alternating northbound and southbound lane closures Camille Drive to I-10.

Crews will be working on pouring manhole aprons.

Sunday, July 7 through Wednesday, July 10 from 8 p.m. to 6 a.m. (Nightly)

  • Mesa (SH-20) northbound will be reduced to one lane from Yandell Drive to Rim Road.

  • Mesa (SH-20) southbound will be reduced to one lane from East Crosby Avenue to East Cliff Drive.

Thursday, July 11 through Friday, July 12 from 8 p.m. to 6 a.m. (Nightly)

  • Mesa (SH-20) northbound and southbound lanes will be reduced to one outside lane from Yandell Drive to Rim Road.

Crews will be milling and paving. Expect delays and intermittent cross-street and driveway closures during milling and paving activities. If possible, seek alternate routes. Please remember those residential/business access locations may be temporarily shifted due to milling/paving activities.

North Mesa Street Lighting Improvement Project

Monday, July 1 through Wednesday, July 3 from 9 a.m. to 4 p.m.

  • Mesa (SH-20) northbound and southbound right lane closures Festival Drive to Sunland Park Drive.

  • Mesa (SH-20) northbound and southbound left lane closures Castellano Drive to Executive Center Boulevard.

  • Mesa (SH-20) northbound and southbound alternating left and right lane closures Executive Center Boulevard to Mesita Drive/Sun Bowl Drive.

  • Mesa (SH-20) northbound and southbound left lane closures Glory Road / East Baltimore Drive to Mesita Drive/Sun Bowl Drive.

Crews will be boring for electrical conduit, pouring drill shaft foundations, potholing, and installing new lighting poles.

Monday, July 8 through Friday, July 12 from 9 a.m. to 4 p.m.

  • Mesa (SH-20) northbound and southbound right lane closures Festival Drive to Sunland Park Drive.

  • Mesa (SH-20) northbound and southbound left lane closures Castellano Drive to Executive Center Boulevard.

  • Mesa (SH-20) northbound and southbound alternating left and right lane closures Executive Center Boulevard to Mesita Drive/Sun Bowl Drive.

  • Mesa (SH-20) northbound and southbound left lane closures Glory Road / East Baltimore Drive to Mesita Drive/Sun Bowl Drive.

Crews will be boring for electrical conduit, pouring drill shaft foundations, potholing, and installing new lighting poles.

Traffic Signal Improvements Project

Monday, July 1 through Tuesday, July 2 from 9 a.m. to 4 p.m.

  • Mesa (SH-20) north and southbound right lane closures at the Resler Drive intersection.

  • Montana (US-62) east and westbound right lane closures at McRae Boulevard intersection.

  • Zaragoza (FM 659) north and southbound right lane closures at Escobar Drive intersection.

  • Zaragoza (FM 659) north and southbound right lane closures at Rojas Drive intersection.

  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Sun Valley Drive intersection.

  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Martin Luther King Boulevard/Kenworthy Street intersection.

Crews will be working on intersection improvements.

Monday, July 8 through Friday, July 12 from 9 a.m. to 4 p.m.

  • Mesa (SH-20) north and southbound right lane closures at the Resler Drive intersection.

  • Montana (US-62) east and westbound right lane closures at McRae Boulevard intersection.

  • Zaragoza (FM 659) north and southbound right lane closures at Escobar Drive intersection.

  • Zaragoza (FM 659) north and southbound right lane closures at Rojas Drive intersection.

  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Sun Valley Drive intersection.

  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Martin Luther King Boulevard/Kenworthy Street intersection.

Monday, July 1 through Friday, July 12 from 6 a.m. to 6 a.m. – Continuous Closure

  • Mesa (SH-20) north and southbound alternating left lane and left turn lane closures at the Camille Drive intersection. The following turning movements will be affected (please remember southbound Mesa is toward downtown, northbound is toward the valley):
    -Southbound Mesa to left turn to Fountain Road.
    -Southbound Mesa to northbound Mesa (U-turn) at Camille Drive intersection.
    -Southbound Mesa left turn to Maguey Place.
    -Camille Drive right turn onto northbound Mesa.
    -Northbound Mesa right turn Camille Drive.
    -Northbound Mesa to southbound Mesa (U-turn) at Camille Drive intersection.
    -Northbound Mesa to southbound (U-turn) Mesa at Maguey Place.
    -Colina Alta Dive to southbound Mesa.
    -Fountain Road to southbound Mesa.
    -Maguey Place to southbound Mesa.

Crews will be working on installing a new raised median. TxDOT is working to expedite this activity and plans to open this area as soon as it is ready, possibly before July 12.

Delta/Alameda & Zaragoza/George Dieter Traffic Signal Improvement Project

Monday, July 1 through Friday, July 12 from 7 a.m. to 7 p.m.

  • Zaragoza and George Dieter intersection alternate lane closures.

  • Alameda and Delta intersection alternate lane closures.

Crews will be working on traffic signals.

Green Ribbon Project

Monday, July 1 through Friday, July 12 from 9 a.m. to 4 p.m.

  • Montana east- and westbound between Airway and Killarney left lane closed.

  • Alameda east- and westbound between Loop 375 and Rio Vista left lane closed.

Crews will be working on median improvements.

Mill/Inlay From SH-20 (Alameda) to Global Reach

Monday, July 1 through Friday, July 12 from 9 a.m. to 4 p.m.

  • Montana east- and westbound between Paisano and Yarbrough alternate lane closures.

Crews will be milling and paving.

Maintenance

Monday, July 1 through Friday, July 12 from 9 a.m. to 3 p.m.

  • Spur 601 east- and westbound between Chaffee and Loop 375 lane closed.

Crews will be working on shoulder.

Montana Frontage Road Project

Monday, July 08 through Saturday, July 27. Daily, from 9 a.m. to 5 p.m.

  • Montana Avenue (US 62/180) eastbound frontage road left lane closure between Dominican Street to Leticia Street.

Crews will be exporting material.

Monday, July 15 through Thursday, July 18. Daily, from 5 p.m. to 9 a.m.

  • Montana Avenue (US 62/180) eastbound frontage road full closure between George Dieter Drive and Joe Battle Boulevard.

Crews will be working on barrier arrangements.

Monday, June 17 through Wednesday, July 17. Continuous closure until further notice:

  • Alba Lane full closure access to Montana Avenue (US 62/180).

  • Wooster Lane full closure access to Montana Avenue (US 62/180).

  • East Glen Drive full closure access to Montana Avenue (US 62/180).

  • Lee Boulevard full closure access to Montana Avenue (US 62/180).

Crews will be working on concrete pavement at intersections.

Monday, July 1 through Tuesday, July 2 from 9 p.m. to 5 a.m.

  • Montana Avenue (US 62/180) westbound frontage road, alternating lane closures between Lee Trevino Drive and Global Reach Drive.

Crews will be working on striping.

Purple Heart Loop 375 Widening

Saturday, June 29 through Sunday, July 28. Daily, from 9 a.m. to 3:30 p.m.

  • Purple Heart Highway (SL 375) north- and southbound left inside lane closure between Montana Avenue and Spur 601.

Crews will be hauling out material in and out of the median.

Continuous closure until further notice

  • Purple Heart Highway north- and southbound shoulder closures from Montana Avenue to Spur 601.

Crews will be widening main lanes and constructing north- and southbound frontage road.

Loop 375 Widening Project

Monday, July 01 through Wednesday, July 03. Nightly, 9 p.m. until 5 a.m.

  • Americas Highway (SL 375) south- and northbound main lane closure between North Loop Bridge Overpass and Zaragoza (P.O.E) Bridge Overpass.

Crews will be working on installing bridge structures.

Monday, July 8 through Thursday, July 11. Nightly, 9 p.m. until 5 a.m.

  • Americas Highway (SL 375) south- and northbound main lane closure between North Loop Bridge Overpass and Zaragoza (P.O.E) Bridge Overpass.

Crews will be working on installing bridge structures.

SH 20 Raised Medians Project

Monday, July 1 through Wednesday, July 3. Daily, 9 a.m. to 4 p.m.

  • SH 20 (Alameda Avenue) east- and westbound inside lane closures between Horizon Boulevard and Passmore Road.

Crews will be performing boring operations.

Monday, July 08 through Friday, July 12. Daily, 9 a.m. to 4 p.m.

  • SH 20 (Alameda Avenue) east- and westbound inside lane closures between Horizon Boulevard and Passmore Road.

Crews will be performing boring operations.

SL 375 Mill & Inlay Project

Sunday, June 30 through Tuesday, July 2. Nightly, 9 p.m. to 6 a.m.

  • SL 375 (Joe Battle Boulevard) north- and southbound alternating right and left lane closures between Pellicano Drive and Montana Avenue.

Crews will be performing milling operations, base repairs and placing hot mix asphalt.

Sunday, July 7 through Thursday, July 11. Nightly, 9 p.m. to 6 a.m.

  • SL 375 (Joe Battle Boulevard) north- and southbound alternating right and left lane closures between Pellicano Drive and Montana Avenue.

Crews will be performing milling operations, base repairs and placing hot mix asphalt.

US 62/180 Mill and Inlay

Monday, July 1 from 9 a.m. to 4 p.m.

  • US 62/180 (Montana Avenue) westbound frontage road, alternating lane closures from Hueco Club Road to Rich Beem Boulevard.

Crews will be working on pavement operations.

Closure Links:

Copyright 2024 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

For the latest news, weather, sports, and streaming video, head to KTSM 9 News.

TxDOT road closures for week of June 28, 2024 (2024)
Top Articles
Latest Posts
Article information

Author: Rev. Porsche Oberbrunner

Last Updated:

Views: 5662

Rating: 4.2 / 5 (73 voted)

Reviews: 80% of readers found this page helpful

Author information

Name: Rev. Porsche Oberbrunner

Birthday: 1994-06-25

Address: Suite 153 582 Lubowitz Walks, Port Alfredoborough, IN 72879-2838

Phone: +128413562823324

Job: IT Strategist

Hobby: Video gaming, Basketball, Web surfing, Book restoration, Jogging, Shooting, Fishing

Introduction: My name is Rev. Porsche Oberbrunner, I am a zany, graceful, talented, witty, determined, shiny, enchanting person who loves writing and wants to share my knowledge and understanding with you.